What to do after deciding to build a house
The first steps after deciding to build: budget, design, contractors, schedule and documents in one organized plan.
Owner builder guide
The first steps after deciding to build: budget, design, contractors, schedule and documents in one organized plan.
What to plan after the shell stage: checks, services, plastering, screeds, insulation, facade and preparation for finishes.
What to prepare before the first contractor arrives: documents, budget, decisions and schedule so the build starts cleanly.
What to prepare before electrical rough-in: sockets, lighting, consumer unit, internet, alarm, smart home, photos and sign-off.
A practical comparison of common roof coverings: tiles, metal tiles and standing seam metal. Cost, durability, installation risks and control in BuildIQ.
A practical checklist for owner-builders: permits, budget, contractors, deadlines, photos and stage sign-offs in one place.
A practical home construction schedule: permits, foundations, shell, services, wet works, finishes and handover.
How much it costs to build a house in 2026, what drives the budget, how to compare quotes and how to keep the build under control.
How to track a home construction budget by stage, invoice, contractor and decision, with a simple system for owner-builders.
A practical comparison of slab foundations and strip footings: when each option makes sense, what affects cost and how BuildIQ helps control the decision.
A practical guide for owner-builders: how to track budget, invoices, documents, photos, contractors and progress in one home construction app.
A practical comparison of wall materials for a house: ceramic blocks, aerated concrete, silicate and masonry units. Cost, labor, acoustics, insulation and build control.
Roof cost depends on structure, covering, roof windows, flashings, gutters and labour. Learn what to track before the budget slips.
Typical shell-stage cost ranges in Poland, the difference between open and closed shell, and the variables that can change the budget.
A practical guide to scheduling plumbing rough-in, avoiding rework and keeping plastering, screeds and heating on track.
A practical timeline for ordering windows, avoiding delays, preparing final measurement and keeping delivery aligned with the build schedule.
The key order of works in a house build and the points where owners most often lose time, money, momentum and budget control.
A practical guide for owner-builders: windows, schedules, budget control, documents, contractors, material lead times and finishing decisions that delay a home build.