Residential Construction Contract Template
General homeowner–contractor template for residential construction projects in the United States. Fill it out online, print the completed contract, or download a blank PDF or editable Word file.
This is a general educational template, not a state-specific legal form and not legal advice. Construction contract requirements vary by state and locality. Required cancellation notices, mechanics-lien notices, deposit limits, licensing disclosures, payment rules and other mandatory language must be checked for the project location before signing.
01 — Parties
02 — Project and scope
03 — Schedule
04 — Contract price and payment schedule
Deposit and progress-payment rules vary by state. Do not use this schedule without checking the rules that apply where the project is located.
05 — Permits, inspections and insurance
06 — Change orders
Document scope, price and schedule changes in writing before changed work proceeds. State law may require specific change-order language or signatures.
07 — Completion, punch list and warranty
08 — State-specific notices and exhibits
Many states require notices about cancellation rights, mechanics liens, deposits, licensing, escrow, warranties or other consumer protections. Add only the notices required for your state and project.
09 — Additional terms

General educational template only. State and local law may require additional terms, notices, formatting, licensing information or cancellation language.
1. Parties
Owner:
Address:
Contractor:
Address:
License / registration:
2. Project and Scope
Project address:
Excluded / owner-supplied work:
Plans/specifications/exhibits:
3. Schedule
Planned start:
Planned substantial completion:
4. Contract Price and Payments
Contract price: $
| Milestone | Amount / % | Due |
|---|---|---|
5. Permits, Inspections and Insurance
Permit responsibility: contractor
Insurance:
6. Change Orders
| Change | Price impact | Schedule impact |
|---|---|---|
7. Completion, Punch List and Warranty
Punch-list process:
Warranty offered:
8. State-Specific Notices and Exhibits
9. Additional Terms
10. Signatures
BuildIQ · mybuildiq.com · Not legal advice.
What should a residential construction contract cover?
A useful contract should clearly identify the parties, project address, scope, plans and specifications, price, payment schedule, start and completion expectations, permit responsibility, change-order process, punch-list procedure, warranties offered and the state-specific notices that apply to the job.
Turn the scope into a project-specific attachment
The contract should not rely on a one-line description of the house or remodel. Use the BuildIQ Residential Construction Scope of Work Template to break included work down by phase or trade, identify materials and references, document exclusions and owner-supplied items, assign responsibilities and record milestones.
Why state-specific review matters
There is no single U.S. residential construction contract form that automatically satisfies every state. California, Texas, Florida and New York are examples of states with materially different consumer-contract or construction-lien requirements. BuildIQ therefore keeps the core template neutral and leaves state-required notices as a separate field rather than inventing one universal legal notice.
Examples of state-specific requirements
California requires detailed written home-improvement contracts and written change orders for covered work. Texas requires a residential-construction disclosure statement in specified transactions. Florida requires a prominent construction-lien notice in certain residential direct contracts. New York requires written home-improvement contracts with specific project, timing, payment and consumer-notice information for covered work.
California CSLB contract guidance · Texas Property Code §53.255 · Florida Statutes §713.015 · New York Attorney General guidance
Change orders
Changes to scope, materials, price or timing should be documented before changed work proceeds. The generator includes a separate change-order table so the parties can record the description, price impact and schedule impact without relying on verbal agreements.
For a dedicated form with revised contract-total and completion-date calculations, use the BuildIQ Construction Change Order Template.
Punch list and closeout
Near the end of the project, keep incomplete or defective work in a structured closeout record rather than scattered messages or verbal notes. The BuildIQ Construction Punch List Template tracks each item by location, trade, responsible party, due date, status and verified completion.
Payment schedules and deposits
Do not assume one deposit rule applies nationwide. For example, California places specific limits on down payments for covered home-improvement contracts, while other states use different consumer-protection mechanisms. The BuildIQ template therefore does not prefill a deposit percentage or statutory payment formula.
PDF or Word?
Use the PDF when you want a fixed blank form for printing. Use the DOCX when you want to customize the blank agreement in Word or compatible software. For a filled contract, the online generator can be printed or saved as PDF from the browser.