BuildIQ / ENVELOPE COST
Build a realistic building-envelope budget.
In four short steps, estimate the roof, windows, doors, and garage door — without pretending to be a full quote.What does it estimate?
Envelope Calculator estimates the elements needed to close in a home. It is indicative and uses versioned provisional rates.
Included
roof covering system, membranes, standard flashings and accessories, windows, exterior doors, garage doors, and installation
Excluded
roof structure, foundations, wall structure, facade, wall insulation, MEP, and finishes
Frequently asked questions+
No. Roof structure is excluded.
No. It is a physical-area proxy; future project data can replace the proxy.
No. Windows use package rates based on count, frame, and level.
No. It is a planning budget, not a commercial quote.
This is not a construction estimate or contractor quote. Confirm scope, dimensions, and installation conditions before ordering.