BuildIQ / HOME SYSTEMS

Heat pump, solar & home energy calculator

In four calm steps, estimate energy use, heat pump capacity, solar, ventilation and home systems.
Build country
Postal code / ZIP
Home floor area
ft²
Model range: 400–20000 ft².
Residents
Bedrooms
Energy standard
Climate

How it works

Enter the home area, occupants, energy standard, location and selected systems. The calculator combines heating, hot water, ventilation, cooling and EV demand into an annual energy estimate and a systems budget.

What affects the result

The main drivers are the home's energy standard, climate, floor area, occupants and selected equipment. Heat-pump efficiency affects electricity use, while solar and battery sizing are estimated from annual demand.

What is included

Depending on your choices, the result can include a heat pump, hot-water energy, solar, battery storage, mechanical ventilation, electrical work and smart-home systems, plus estimated annual energy use and cost.

What is not included

The result does not replace a heating-load calculation, ventilation design or electrical design. Solar and battery sizing is indicative and is not a detailed hour-by-hour simulation.

How to use the estimate

Compare system options and use the result as a starting point for installer discussions. Confirm final equipment sizes and design decisions once the building parameters are known.

Frequently asked questions

Does the calculator size the heat pump?

It shows an indicative capacity range for the home inputs. Final sizing should follow a proper heating-load calculation.

How accurate is the energy-use estimate?

It is a planning estimate for budgeting and comparing options, not a system design.

Are energy prices current?

The calculator uses BuildIQ data that is updated periodically. It does not fetch real-time energy prices.

Does it include solar and battery storage?

Yes. It can estimate solar capacity, annual generation and battery capacity for the entered home.

Does the result replace a heating-load or system design?

No. It helps with budget and scope planning but does not replace heating, ventilation or electrical design.

Related calculators