BuildIQ / foundations
Foundation cost calculator
A clear starting point for your foundation decision. Add your site conditions to see a useful budget range.What does the result include?
Typical earthworks, materials, foundation execution, and standard site logistics for the selected option.
What does it exclude?
Structural design, geotechnical testing, specialist drainage, utility connections, and work outside the building footprint.
Why do soil and water matter?
Poor soil, rock, and groundwater can change earthwork scope and foundation protection.
Frequently asked questions+
Does this replace a quote? No — it helps you prepare a realistic budget before speaking with a contractor.
Can I use it without soil data? Yes — select Unknown; the range will be wider.
Is location included? The calculator uses data for the selected market. Conditions at a specific site can change the actual cost.
Is this a foundation design? No. Structural design belongs to a qualified designer.
This is an indicative budget, not a structural design or contractor quotation.