BUILDIQ / FINISHING

Home finishing cost calculator

Build a practical finishing budget from the standards and scope you choose.

Home

Finish existing stairs

How it works

Enter usable area, storeys, bathrooms, internal doors, stairs and kitchen size. The model derives budget geometry for walls, ceilings and floors, then separates materials from labor.

What affects the result

Every module has its own BASIC, STANDARD or PREMIUM tier. LOW, TYPICAL and HIGH are the uncertainty range for the selected configuration, not alternative finish packages.

What is included

The result includes wall and ceiling preparation and painting, finished floors, visible bathroom finishes, kitchen cabinetry with worktop, sink and tap, internal doors and selected stair finishing.

What is not included

Appliances, structural work, plastering, rough-in systems, base electrical, HVAC, heat pump, PV, ventilation, smart home, exterior work and stair construction are excluded.

How to use the estimate

Compare module tiers before requesting quotes and use the systems calculator alongside it so services and visible finishes are not counted twice.

Frequently asked questions

What does LOW, TYPICAL and HIGH mean?

Every module has its own BASIC, STANDARD or PREMIUM tier. LOW, TYPICAL and HIGH are the uncertainty range for the selected configuration, not alternative finish packages.

Are appliances included?

The result includes wall and ceiling preparation and painting, finished floors, visible bathroom finishes, kitchen cabinetry with worktop, sink and tap, internal doors and selected stair finishing.

Does the kitchen include a worktop?

Appliances, structural work, plastering, rough-in systems, base electrical, HVAC, heat pump, PV, ventilation, smart home, exterior work and stair construction are excluded.

Are rough-in systems included?

Compare module tiers before requesting quotes and use the systems calculator alongside it so services and visible finishes are not counted twice.

Related calculators