BuildIQ / structure
Build a realistic structure budget.
In three short steps, estimate structural walls, floors, quantities, and labor — without pretending to be a structural design.Structure Calculator estimates external and internal load-bearing walls, structural floors, typical allowances, and erection labor.
Structure Calculator estimates external and internal load-bearing walls, structural floors, typical allowances, and erection labor.
Masonry or timber?
Technology, geometry, openings, and local rates move the result. The range helps you prepare better first conversations with contractors.
Included
external structural walls, internal load-bearing walls, structural floor system, typical structural allowances, erection and labor
Excluded
foundations, roof structure, windows and doors, thermal insulation, facade, installations, and finishes
Frequently asked questions+
No. It is a budget estimate; structural design belongs to a qualified designer.
No. Roof framing is outside the Structure Calculator scope.
No. Final framing takeoff must follow construction documents.
No. Foundation is a separate stage and is excluded.
This calculator does not design structures, select member sizes, or calculate capacity. It does not replace construction documents. Roof framing and foundations are excluded.